
Add to Cart
A: 1. all inquiries will be replied to within two hours except during sleeping time in China.
2. Our call phones stand by any calls at any time.
A: Generally sample can be sent out within 7 days after the drawing is confirmed by both sides.
A: 1. you can send us your sample, we will scan it and make 2D and 3D drawings for your checking.
2. rough drawing by hand is also acceptable.
A: PayPal, TT, western union, L/C, etc.
Quality Assurance | ISO9001:2008 Certified | ||||
Machining Equipment | CNC Machining Center /Composite CNC Machine / CNC Lathes / Grinding Machines / Milling Machines / Wire-cuts / Laser Cuts / CNC Shearing Machines / CNC Bending Machines / etc. | ||||
Materials | Aluminum Alloy: | ||||
6061/ 6063 / 7075 /5052 ADC12/518 etc. | |||||
Brass Alloy: | |||||
H59 / H62 / H64/ 3602 / 2604 / etc. | |||||
Stainless Steel Alloy: | |||||
316L / 304 / 316 / 412 / etc. | |||||
Steel Alloy: | |||||
Carbon Steel / Die Steel / Spring Steel etc. | |||||
Other Special Materials: | |||||
Titanium/ Lucite / Nylon / Bakelite / POM / ABS / PP / PC / PE / PEEK etc. | |||||
We handle many other types of materials. Please contact us if your required material is not listed above. | |||||
Surface Treatment | Plating, Brushing, Polishing, Sandblasting, Anodizing, Pickling& Passivation, Vibration, PVD, Nickel Plating, tinting, etc. | ||||
Inspection | three-coordinate measuring machine /Mitutoyo Tool Microscope can measure up to 300mmX x 175mmY x 220mmZ | ||||
File Formats | Solid Works, Pro/Engineer, AutoCAD(DXF, DWG), PDF, IGS, STP etc. |
What is the cooperation process?
1. quotation
Quotation time (within 5 minutes at the fastest, 24 hours at the slowest, except in special circumstances). We will reply to the customer as soon as we receive the drawing or sample.
2. Quality
① Equipment support: We are an entity factory with complete equipment, including a lathe, milling machine, grinding machine, drilling machine, wire cutting (fast and slow), CNC (turning and milling), engraving machine, etc.
② Quality inspector: there is a special person to do a relevant inspection on the parts.
③ Service team: arrange professional leaders to follow up.
3. Delivery date
① Production time: Order followers follow up the whole process. If there is any change in the delivery date, communicate and negotiate with the customer 2 days in advance;
② Logistics delivery: Due to the weight of mechanical products, delivery methods need to be negotiated by both sides, for relatively small products are generally sent mainly by express, for relatively large or heavy products are sent to logistics or steam, but also hope that buyers understand, the specific consensus